List the whole project

Allow for surveys, investigations, design, permits, site preparation, the main construction scope, utilities, interiors, external works and taxes as applicable.

Compare the same scope

Ask bidders to identify quantities, materials, inclusions and exclusions. Clarify the treatment of fixtures, cabinetry, compound walls, landscaping and connections before comparing totals.

Plan for change

Set a contingency appropriate to your circumstances and agree how variations are approved. Record decisions and payment stages in writing.

Turn the answer into a practical plan

Start by writing down the decision you need to make, the information you already have and what remains uncertain. For a home project, that often means gathering the plot survey, ownership and access details, a list of rooms and a realistic total budget. This makes an early conversation with a designer more productive.

Ask for the proposed scope and assumptions in writing. Separate the cost of the building from permits, utility connections, interiors and external work, and understand who is responsible for each. As the design develops, compare decisions against how the house will be used, maintained and adapted over time.

Common questions

What should a budget cover?

Include design, approvals, investigation, site preparation, construction, utilities, interiors, external work, taxes and a suitable contingency.

Why are square-foot rates unreliable alone?

Different quotations may include different foundations, materials and finishing. Compare an itemised scope tied to drawings.