What to understand

Identify roof outlets, paved surfaces and where water naturally collects or leaves the site. A blocked or undersized outlet can cause ponding even when the building itself looks sound.

What to discuss with your team

Coordinate the finished ground levels and legal discharge route before paving or landscaping. Keep gutters and drains accessible for cleaning and avoid redirecting runoff onto a neighbour.

From observations to an engineered decision

Begin with a site survey and a discussion of the intended building, proposed loads and any history of filling, groundwater or waterlogging. These observations help a professional decide what ground information is needed; they do not establish how much load the ground can safely carry.

A competent engineer can interpret the investigation, select an appropriate foundation and coordinate excavation, drainage and construction checks. Ask what the recommendation is based on and how changes discovered during excavation will be handled. Avoid copying a footing depth or detail from another plot.

Common questions

What is the difference between roof and site drainage?

Roof drainage carries water from the roof; site drainage manages runoff across the ground. They must be coordinated with permitted outlets.

What should I check before paving?

Where water enters and leaves, finished surface slopes, access to drains and whether an outlet is legally and practically available.

Need advice for your project?

Share your location, plot details and questions with our team for a conversation about your particular requirements.

Discuss your project