What to understand
Walk through each room and list sockets, lights, fans, appliances and network points before plastering. Include future requirements without overloading circuits.
What to discuss with your team
A qualified electrician should design protection, earthing and circuit sizes to applicable requirements. Keep a record of concealed routes for future maintenance.
Plan the finished space before ordering
Measure the room and list the people, appliances and daily activities it must accommodate. A drawing should show usable storage, door movement, circulation, plumbing and electrical points. Check the chosen products against their actual exposure to water, heat and wear rather than selecting from appearance alone.
Ask the supplier or installer about the precise material, finish, edge treatment, care instructions and warranty. Compare the installed cost and keep access to services that may need repair. Good coordination before plastering, tiling or cabinet fabrication can prevent costly changes later.
Common questions
How many sockets should I plan?
List the appliances and uses in each room with a qualified electrician instead of relying on a single number. Include safe and accessible locations.
Can points be added later?
Sometimes, but it can disturb finished walls. Early planning and accurate records of concealed wiring make changes easier.